From £30k–£55k+

Single-Storey Extensions in the West Midlands

Open up the back, side or wrap-around at ground level to create the kitchen-diner, family room or utility your home is missing.

Benefits

Why homeowners choose single-storey extensions

  • Open-plan flow and far better daylight
  • Often achievable under permitted development
  • Most common extension type — well-understood programme
  • Typically less disruption than double-storey work
Who it suits

Who it suits

  • Families wanting a true kitchen-diner
  • Period homes with awkward galley kitchens
  • Anyone needing utility, WC or playroom space
  • Homes where bedrooms upstairs are sufficient
Single-storey extensions project example
Cost guidance

What a single-storey extensions typically costs

Planning-stage range: from £30k to £55k+. What pushes a project up or down:

  • Size and structural complexity
  • Amount of glazing — sliders, bifolds, rooflights
  • Kitchen specification and appliances
  • Ground conditions and drainage
  • Finish level — flooring, joinery, ironmongery
  • Planning and design fees (separate from build cost)
Householder planning fees and professional design costs are separate from build cost. We make these visible from the start, not buried in the build.

Full West Midlands extension cost guide →

Planning & regulations

Planning and building regs

Many single-storey rear and side extensions fall within permitted development, but eligibility depends on the property, site and proposal. Even where planning is not required, building regulations approval is needed.

Useful reading:

Process

How a single-storey extensions project runs with us

1

Free initial chat

Postcode, brief and rough budget. We come back with a planning-stage estimate and next steps.

2

Survey and concept design

On-site measure, brief workshop and concept tied to the budget.

3

Planning and building regs

Applications, structural calcs and building control sign-off coordinated end-to-end.

4

Build

One site team, weekly updates, kitchen and glazing coordinated for you.

5

Handover and aftercare

Snagging, certificates and a workmanship warranty issued at completion.

Recent work

Featured single-storey extensions projects

Single-storey rear extension in Solihull — finished extension
Solihull · £58,000

Single-storey rear extension

12 weeks

View project
Bungalow rear extension in West Bromwich — finished extension
West Bromwich · £64,000

Bungalow rear extension

13 weeks

View project
Rear extension with utility in Walsall — finished extension
Walsall · £52,000

Rear extension with utility

12 weeks

View project
FAQs

Frequently asked questions

How much does a single-storey extensions cost?

Indicative planning-stage range: from £30k to £55k+. Final pricing depends on size, structure, glazing, kitchen spec, ground conditions, drainage and finishes. Full cost guide.

Do I need planning permission for a single-storey extensions?

Many single-storey rear and side extensions fall within permitted development, but eligibility depends on the property, site and proposal. Even where planning is not required, building regulations approval is needed. Read the planning guide.

How long does a single-storey extensions take?

Most single-storey projects take 10–14 weeks on site. Double-storey and wrap-around projects typically take 16–22 weeks. Planning and design lead in usually adds 8–14 weeks.

Will you handle planning and building regs?

Yes — applications, structural calcs and building control sign-off are coordinated as part of our design-to-build process.

Do you cover my area?

We work across the West Midlands including Birmingham, Solihull, Wolverhampton, Dudley, Walsall and Coventry.

Next step

Get a planning-stage estimate

Tell us about the project. We will come back with realistic budget guidance and likely process — no hard sell.

Step 1 of 2 · Your detailsStep 2 of 2 · Project
Thanks — your enquiry is in.
We will review the details and come back to you with sensible next steps. No hard sell.
e.g. B91 2AA, WV3 0NF.
A realistic budget range helps us give more useful guidance. It does not lock you into anything.

No hard sell. We will review your project and come back with next steps.