Walsall · Rear extension

Rear extension with utility in Walsall

An Aldridge family wanted a proper utility and a bigger kitchen-diner.

Extension type
Rear extension
Approx size
6m x 3.5m
Budget band
£52,000
Timeline (on site)
12 weeks
Brief

The before challenge

An Aldridge family wanted a proper utility and a bigger kitchen-diner.

Solution

What we designed and built

Single-storey rear with a dedicated utility-WC, a redesigned kitchen-diner and a 3-panel slider to the garden.

Scope highlights

  • Rear extension with utility with full structural design
  • Coordinated glazing — sliders, rooflights or bifolds
  • Kitchen and joinery integration
  • Building regulations sign-off coordinated
  • Planning route: Permitted development
Before & after

The transformation

Cramped kitchen with no utility.
Before
Roomy kitchen-diner with utility door.
After
FAQs

Frequently asked questions

How much did this project cost?

Budget band: £52,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.

How long did the build take?

On-site duration: 12 weeks. Planning and design lead in adds typically 8–14 weeks before site start.

What was the planning route?

Permitted development. Eligibility for permitted development depends on the property and proposal — we confirm per project.

Can we do something similar?

Yes — we deliver rear extension with utilitys across Walsall and the wider West Midlands. Tell us about your project.

Next step

Want something similar in your home?

Tell us your postcode and project type — we will come back with realistic budget guidance and likely next steps.