
Over-Garage Extensions in the West Midlands
Add a bedroom, study or en-suite over an attached or integral garage. Practical, often well-suited to permitted development.
Why homeowners choose over-garage extensions
- Often achievable under permitted development
- Keeps driveway and garage
- Cleaner front elevation
- Predictable cost band
Who it suits
- Families needing an extra bedroom without losing garden
- Homes with an integral or attached garage
- Anyone wanting a cleaner front elevation
- Multi-generational households

What a over-garage extensions typically costs
Planning-stage range: from £25k to £55k+. What pushes a project up or down:
- Size and structural complexity
- Amount of glazing — sliders, bifolds, rooflights
- Kitchen specification and appliances
- Ground conditions and drainage
- Finish level — flooring, joinery, ironmongery
- Planning and design fees (separate from build cost)
Planning and building regs
Over-garage extensions can fall within permitted development depending on the property and height. Building regulations approval is required, including for fire safety and floor build-up.
Useful reading:
How a over-garage extensions project runs with us
Free initial chat
Postcode, brief and rough budget. We come back with a planning-stage estimate and next steps.
Survey and concept design
On-site measure, brief workshop and concept tied to the budget.
Planning and building regs
Applications, structural calcs and building control sign-off coordinated end-to-end.
Build
One site team, weekly updates, kitchen and glazing coordinated for you.
Handover and aftercare
Snagging, certificates and a workmanship warranty issued at completion.
Frequently asked questions
How much does a over-garage extensions cost?
Indicative planning-stage range: from £25k to £55k+. Final pricing depends on size, structure, glazing, kitchen spec, ground conditions, drainage and finishes. Full cost guide.
Do I need planning permission for a over-garage extensions?
Over-garage extensions can fall within permitted development depending on the property and height. Building regulations approval is required, including for fire safety and floor build-up. Read the planning guide.
How long does a over-garage extensions take?
Most single-storey projects take 10–14 weeks on site. Double-storey and wrap-around projects typically take 16–22 weeks. Planning and design lead in usually adds 8–14 weeks.
Will you handle planning and building regs?
Yes — applications, structural calcs and building control sign-off are coordinated as part of our design-to-build process.
Do you cover my area?
We work across the West Midlands including Birmingham, Solihull, Wolverhampton, Dudley, Walsall and Coventry.
Get a planning-stage estimate
Tell us about the project. We will come back with realistic budget guidance and likely process — no hard sell.

