Double-storey extension in Wolverhampton
A Tettenhall family needed both more kitchen and another bedroom with en-suite.
The before challenge
A Tettenhall family needed both more kitchen and another bedroom with en-suite.
SolutionWhat we designed and built
Double-storey rear extension projecting into the garden: an open-plan kitchen-diner with full-width sliding doors downstairs, and a master bedroom with walk-in wardrobe and en-suite above. Matching brick to the ground floor with a contemporary charcoal timber-clad first floor and a clean flat roof.
Scope highlights
- Double-storey extension with full structural design
- Coordinated glazing — sliders, rooflights or bifolds
- Kitchen and joinery integration
- Building regulations sign-off coordinated
- Planning route: Householder planning
The transformation


Frequently asked questions
How much did this project cost?
Budget band: £96,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.
How long did the build take?
On-site duration: 22 weeks. Planning and design lead in adds typically 8–14 weeks before site start.
What was the planning route?
Householder planning. Eligibility for permitted development depends on the property and proposal — we confirm per project.
Can we do something similar?
Yes — we deliver double-storey extensions across Wolverhampton and the wider West Midlands. Tell us about your project.