Coventry · Over-garage extension
Over-garage extension in Coventry
An Earlsdon family needed a fourth bedroom and a small en-suite without losing their driveway.
Extension type
Over-garage extension
Approx size
5m x 3m
Budget band
£36,000
Timeline (on site)
9 weeks
Brief
The before challenge
An Earlsdon family needed a fourth bedroom and a small en-suite without losing their driveway.
SolutionWhat we designed and built
Over-garage bedroom and en-suite with matching brick, internal staircase reconfiguration and roof tie-in.
Scope highlights
- Over-garage extension with full structural design
- Coordinated glazing — sliders, rooflights or bifolds
- Kitchen and joinery integration
- Building regulations sign-off coordinated
- Planning route: Permitted development
Before & after

Before

After
The transformation


FAQs
Frequently asked questions
How much did this project cost?
Budget band: £36,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.
How long did the build take?
On-site duration: 9 weeks. Planning and design lead in adds typically 8–14 weeks before site start.
What was the planning route?
Permitted development. Eligibility for permitted development depends on the property and proposal — we confirm per project.
Can we do something similar?
Yes — we deliver over-garage extensions across Coventry and the wider West Midlands. Tell us about your project.