West Bromwich · Single-storey extension

Bungalow rear extension in West Bromwich

A Charlemont bungalow needed a much bigger open-plan living space.

Extension type
Single-storey extension
Approx size
5m x 6m
Budget band
£64,000
Timeline (on site)
13 weeks
Brief

The before challenge

A Charlemont bungalow needed a much bigger open-plan living space.

Solution

What we designed and built

Single-storey rear with a vaulted dining zone, two rooflights, full-height glazing and an internal reconfiguration of the existing living-dining wall.

Scope highlights

  • Bungalow rear extension with full structural design
  • Coordinated glazing — sliders, rooflights or bifolds
  • Kitchen and joinery integration
  • Building regulations sign-off coordinated
  • Planning route: Householder planning
Before & after

The transformation

Dated reception with low ceiling.
Before
Vaulted dining hall with rooflights.
After
FAQs

Frequently asked questions

How much did this project cost?

Budget band: £64,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.

How long did the build take?

On-site duration: 13 weeks. Planning and design lead in adds typically 8–14 weeks before site start.

What was the planning route?

Householder planning. Eligibility for permitted development depends on the property and proposal — we confirm per project.

Can we do something similar?

Yes — we deliver bungalow rear extensions across West Bromwich and the wider West Midlands. Tell us about your project.

Next step

Want something similar in your home?

Tell us your postcode and project type — we will come back with realistic budget guidance and likely next steps.