Sutton Coldfield · Wrap-around extension

Wrap-around extension in Sutton Coldfield

A Mere Green family bought a four-bed semi but the ground floor felt small and disconnected.

Extension type
Wrap-around extension
Approx size
7m x 6m
Budget band
£118,000
Timeline (on site)
20 weeks
Brief

The before challenge

A Mere Green family bought a four-bed semi but the ground floor felt small and disconnected.

Solution

What we designed and built

Wrap-around to the side and rear finished in smooth off-white render, spanning half the rear elevation and wrapping the side return across to the boundary. A flat roof with a single roof lantern, a structural opening into the existing reception, aluminium bifold doors to the garden and underfloor heating throughout.

Scope highlights

  • Wrap-around extension with full structural design
  • Coordinated glazing — sliders, rooflights or bifolds
  • Kitchen and joinery integration
  • Building regulations sign-off coordinated
  • Planning route: Householder planning
Before & after

The transformation

Pinched side return, dark kitchen.
Before
Wrap-around exterior in smooth off-white render.
After
FAQs

Frequently asked questions

How much did this project cost?

Budget band: £118,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.

How long did the build take?

On-site duration: 20 weeks. Planning and design lead in adds typically 8–14 weeks before site start.

What was the planning route?

Householder planning. Eligibility for permitted development depends on the property and proposal — we confirm per project.

Can we do something similar?

Yes — we deliver wrap-around extensions across Sutton Coldfield and the wider West Midlands. Tell us about your project.

Next step

Want something similar in your home?

Tell us your postcode and project type — we will come back with realistic budget guidance and likely next steps.