Wrap-around extension in Sutton Coldfield
A Mere Green family bought a four-bed semi but the ground floor felt small and disconnected.
The before challenge
A Mere Green family bought a four-bed semi but the ground floor felt small and disconnected.
SolutionWhat we designed and built
Wrap-around to the side and rear with a 3.6m vaulted dining zone, structural opening to the existing reception, large central rooflight and underfloor heating throughout.
Scope highlights
- Wrap-around extension with full structural design
- Coordinated glazing — sliders, rooflights or bifolds
- Kitchen and joinery integration
- Building regulations sign-off coordinated
- Planning route: Householder planning
The transformation


Frequently asked questions
How much did this project cost?
Budget band: £118,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.
How long did the build take?
On-site duration: 20 weeks. Planning and design lead in adds typically 8–14 weeks before site start.
What was the planning route?
Householder planning. Eligibility for permitted development depends on the property and proposal — we confirm per project.
Can we do something similar?
Yes — we deliver wrap-around extensions across Sutton Coldfield and the wider West Midlands. Tell us about your project.