Halesowen · Kitchen extension
Kitchen extension with rooflights in Halesowen
A Hayley Green semi had a kitchen that felt boxed in.
Extension type
Kitchen extension
Approx size
5m x 3.5m
Budget band
£48,000
Timeline (on site)
10 weeks
Brief
The before challenge
A Hayley Green semi had a kitchen that felt boxed in.
SolutionWhat we designed and built
Single-storey rear with three rooflights, an open-plan kitchen-diner and an internal opening to the existing reception.
Scope highlights
- Kitchen extension with rooflights with full structural design
- Coordinated glazing — sliders, rooflights or bifolds
- Kitchen and joinery integration
- Building regulations sign-off coordinated
- Planning route: Permitted development
Before & after

Before

After
The transformation


FAQs
Frequently asked questions
How much did this project cost?
Budget band: £48,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.
How long did the build take?
On-site duration: 10 weeks. Planning and design lead in adds typically 8–14 weeks before site start.
What was the planning route?
Permitted development. Eligibility for permitted development depends on the property and proposal — we confirm per project.
Can we do something similar?
Yes — we deliver kitchen extension with rooflightss across Halesowen and the wider West Midlands. Tell us about your project.