Side-return kitchen extension in Dudley
A large detached home in Sedgley had a narrow galley kitchen with a useless side passage.
The before challenge
A large detached home in Sedgley had a narrow galley kitchen with a useless side passage.
SolutionWhat we designed and built
Side-return infill with a wide rooflight, internal wall opening to the dining room and a new shaker kitchen with peninsula.
Scope highlights
- Side-return kitchen extension with full structural design
- Coordinated glazing — sliders, rooflights or bifolds
- Kitchen and joinery integration
- Building regulations sign-off coordinated
- Planning route: Permitted development
The transformation


Frequently asked questions
How much did this project cost?
Budget band: £44,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.
How long did the build take?
On-site duration: 11 weeks. Planning and design lead in adds typically 8–14 weeks before site start.
What was the planning route?
Permitted development. Eligibility for permitted development depends on the property and proposal — we confirm per project.
Can we do something similar?
Yes — we deliver side-return kitchen extensions across Dudley and the wider West Midlands. Tell us about your project.