Birmingham · Kitchen extension

Kitchen-diner rear extension in Birmingham

A Moseley family of four had a dark, dated kitchen cut off from the garden.

Extension type
Kitchen extension
Approx size
6m x 4m
Budget band
£62,000
Timeline (on site)
14 weeks
Brief

The before challenge

A Moseley family of four had a dark, dated kitchen cut off from the garden.

Solution

What we designed and built

We designed a 6m x 4m single-storey rear with a 4-panel sliding door, two 1500mm rooflights and a proper utility-WC zone. Existing kitchen wall removed with a flush steel.

Scope highlights

  • Kitchen-diner rear extension with full structural design
  • Coordinated glazing — sliders, rooflights or bifolds
  • Kitchen and joinery integration
  • Building regulations sign-off coordinated
  • Planning route: Householder planning
Before & after

The transformation

Original galley kitchen with no view of the garden.
Before
Open-plan kitchen-diner with island and bifolds.
After
FAQs

Frequently asked questions

How much did this project cost?

Budget band: £62,000. Final price depends on size, glazing, kitchen spec, ground conditions and finishes. Cost guide.

How long did the build take?

On-site duration: 14 weeks. Planning and design lead in adds typically 8–14 weeks before site start.

What was the planning route?

Householder planning. Eligibility for permitted development depends on the property and proposal — we confirm per project.

Can we do something similar?

Yes — we deliver kitchen-diner rear extensions across Birmingham and the wider West Midlands. Tell us about your project.

Next step

Want something similar in your home?

Tell us your postcode and project type — we will come back with realistic budget guidance and likely next steps.